Buttweld Tee Carbon Steel Pipe Fitting

Customization: Available
Type: Equal
Connection: Welding

Products Details

  • Overview
  • Product Description
  • Detailed Photos
  • Packaging & Shipping
  • Workshop
  • FAQ
Overview

Basic Info.

Model NO.
1/2"-72" Sch10-Sch160
Shape
Equal Tee
Lateral
30°Tee
Head Code
Square
Wall Thickness
XXS
Finish
Varnish Paint
Technics
Forged
Pressure Rating
2000LBS
Standard
JIS
Certification
ISO, API, CE
Dn:15 to 2000mm
Thickness:2 to 200mm
Certificate
ISO9001
API
API 5L
Transport Package
Pallet, Wooden Case, Bunded
Specification
API, ISO
Trademark
ST
Origin
Cangzhou, China
HS Code
730793
Production Capacity
50, 000 Ton/Year.

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
1.000kg

Product Description

Buttweld Tee Carbon Steel Pipe Fitting
 
Product Description

 


Material:
Alloy, 10#, 15#, 20#, 30#, 45#, Q195, Q235, Q345, 16Mn, GRADE: A/B/C/D
Technics: Forged
Type: Tee, high pressure tee pipe fitting tee
Place of Origin: Hebei China (Mainland)
Model Number: High pressure tee pipe fitting tee
Brand Name: ST
Connection: Welding
Shape: Reducing
Head Code: Circle
Certification: ISO 9001: 2000, API,
Usage: Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, , etc
Standard: ASME/ANSI/DIN/GB/EN/SH/GD/
Packaging & Delivery
Packaging Detail: Standard export packing
Delivery Detail: About 30days according to customer's order
Specifications
High pressure tee pipe fitting tee ISO9001: 2000, API,
ANSI, JIS, DIN, BS, ISO, GOST, etc
Inspection and small order can be accepted
High pressure tee pipe fitting tee
1. Size: 1/2"~80" WT: Sch5~sch160 XXS
2. Standard: ASME/ANSI/DIN/GB/EN/SH/GD/
3. Material of high pressure tee pipe fitting tee:
Carbon steel
10#, 15#, 20#, 30#, 45#, Q195, Q235, Q345, 16Mn, GRADE: A/B/C/DA234WPB, A106 B, A516-55, A333 Gr6, A182 SA105, 1010, 1012, 1025 1060, 045M10, 095M10, 050A200, 60A30, 060A35S10C, S15C, S20C, S25C, S30C, S35C, S40C, S45C, XC10, XC12, XC18, XC32, XC38TS, XC38H1
Alloy steel
A234 WP11, WP12, WP22, WP5, WP9, 12Cr1MOV, 1Cr5Mo 15CrMo, 10CrMo910, SA335 P11, P12, P22, P5, P9, A213 T11, T12, T22, T5, T9A182 F22, A182 F9, A182 F5SCM415, SCM21, 16CrMo44(1.7337), A387 Cr. B, 15XM, 12CD4, 10CrMo910, STPA25, 12CrMo194
Stainless steel
OCr18Ni10Ti, oCr18Ni9, 302, S30200, 303, S30300, 304, S30400, 304L, 321, S32100 and so on
4. Application of pipe fitting tee: Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, , etc
5. Certification: ISO 9001: 2000, API, CE, , TSG, EN
We can accept small order and inspection before loading. Look forward to cooperating with you
  CHEMICAL HIGH PRESSURE TEE
size Seamless: from 1/2" to 24"
Welded: from 24" to 96" ( or as customer requirements)
Type Equal tee, Reduced Tee, Lateral Tee,  
thickness SCH60, XS, SCH80., SCH100, SCH120, SCH140, SCH160, XXS
standard ASME B16.9,   ASME B16.25,   MSS SP-75    DIN2615   JISB2311  JISB2312  JISB2313
material Carbon steel(ASTM A234WPB, , A234WPC, A420WPL6. ect)
Stainless steel(ASTM A403 WP304, 304L, 316, 316L, 321. ect)
Alloy steel(ASTM A234 WP12, WP11, WP22, WP5, WP9, WP91, ect)
qualification ISO9001: 2008, ISO 14001 OHSAS18001  acquired the license for manufacturing special pressure Pipline equipments from AQSIQ, API and became a member of first - grade supply network of State Power Corporation and China National Petroleum Corporation. We are also qualified the standard material supplier of China National Offshore Oil Corporation and China Petroleum Pipline Bureau. It was recognized by China Classification Society and admitted an associator  by EnergyAhead Sources Net of China Petroleum Distribution Electronic Market.
packing in wooded cases or pallets, or as for clients' requirements
application Petroleum, chemical, machinery, electric power, shipbuilding, papermaking, construction, etc

Detailed Photos
Buttweld Tee Carbon Steel Pipe Fitting
Buttweld Tee Carbon Steel Pipe Fitting

 

Buttweld Tee Carbon Steel Pipe Fitting
Buttweld Tee Carbon Steel Pipe Fitting

 
Buttweld Tee Carbon Steel Pipe Fitting
Buttweld Tee Carbon Steel Pipe Fitting
 
Packaging & Shipping

 

Buttweld Tee Carbon Steel Pipe Fitting
Buttweld Tee Carbon Steel Pipe Fitting
 
Workshop

 

Buttweld Tee Carbon Steel Pipe Fitting
Buttweld Tee Carbon Steel Pipe Fitting
FAQ

1.Q:Are you a factory or trading company?
A: We are a factory. we also have brother factory doing other steel business. Shentian is a Group Co.,Ltd.

2.Q:Where is your factory located? How can I visit there?

A: Our factory is located in Cangzhou City, China, about 40 minutes from Canzhou west station to our factory. And 120 kilometer from Tianjin International air port. Warmly welcome you to visit us!

3.Q:Can I get some samples?

A: Yes,we are honored to supply you free samples.

4.Q:How does your factory do regarding quality control?

A: "Quality today, market tomorrow" Inspection and trace back No. We serious control the quality from raw material to finished pipes. So that that we can 100% sure our goods is qualified.

5. Q: Price high ?

A: Our price is workable. We had tried use auto equipment to save Workers cost. and control other costs. like humuan sources, logistics etc.

6. Q: After sales service.

A: Quality are promised. If our products are not meet the contract we would like to send free goods to you.



 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours