Basic Info.
Model NO.
B70
Section Shape
Round
Certification
CSA
Shape
Round
Customized
Non-Customized
Gasket Material
NR
Item Name
CSA B70 Hubless Cast Iron Pipes and Fittings
Size
1.5" to 15"
Length
10FT Each Pieces (3048mm)
Approval
CSA
Color
Black
Package
Wood Pallet
Pipe Usage
Waste Water
Market
Canada, North America
Delivery Time
15 Days to 30 Days
Material
Grey Cast Iron
Paint
Black Bituminous Paint
Marking
Customized
Fittings
Wye, Tee, etc
MOQ
1ton
Port of Delivery
Xingang Port
Transport Package
Pallet
Specification
1.5-15"
Trademark
dinggin
Origin
China
Production Capacity
50000ton/Month
Product Description
No Hub Plumbing CSA B70 Hubless Cast Iron Pipes Cast Iron Fittings China Factory ASTM A888
1. Basic Specification:
2. Company Introduction:
Dinggin Hardware (Dalian) Co.ltd is a professional supplier and exporter for Cast Iron Pipes and Fittings in north of China for more than 15 years.
We supply cast iron pipes and fittings of CSA B70 and ASTM A888 for waste water, ventilation and rainwater.
we have production capacity of 15000tons for cast iron pipes and 5000tons for cast iron fittings each year.
As the professional supplier, we have a high-qualified team focused on products design, quality control and customer service.
we strictly follow the quality management system ISO9001. Cast Iron Pipes and fittings are CSA and UPC certified.
we also supply stainless steel couplings for pipes and fittings.
For CSA B70 cast iron pipes and fittings, our main customers are in Canada.
3. Package:
4. Delivery Time:
The finished time of orders depends on our production schedule plan and your order qty.
normally the cast iron pipes finish time is more quickly, after order confirmed, we could finish in 2 weeks.
The cast iron fittings take a bit longer time than pipes, normally it will take about 4-6 weeks.
But mechnical mould fittings are finished more quickly, it will only take about 3-4 weeks.
5. Quality Control:
We have QC team to inspect each order.
a. we check the raw material chemical components analysis to make sure the material is qualifed of grey cast iron.
b. during production we will check the hydrostatic test, wall thickness, length etc.
d. final inspection before delivery
6. Payment Terms:
We accept TT and LC payment.
30% deposit, balance paid before sending out from factory.
7: Other products related to cast Iron fittings:
8. Contact Information:
1. Basic Specification:
Standard: | B70 |
Size: | 1.5"/2"/3"/4"/5"/6"/8"/10"/12"/15" , L=3048MM(10ft) |
Types: | bend, Sanitary Tee, Wye, increaser/Reducer, double wye, double apartment fittings, P traps, Single Apartment Fittings, Tapped Ty, Malcoin-Ends Cleanouts Bolted cover-anthes style hubless, Line Cleanout, Barrett Line Cleanouts bolted cover hubless, Urinal Fittings, Extended Floor Flange, Combination Y, |
Paint: | Black Bituminous paint both in side and outside |
Certificate: | CSA approved |
2. Company Introduction:
Dinggin Hardware (Dalian) Co.ltd is a professional supplier and exporter for Cast Iron Pipes and Fittings in north of China for more than 15 years.
We supply cast iron pipes and fittings of CSA B70 and ASTM A888 for waste water, ventilation and rainwater.
we have production capacity of 15000tons for cast iron pipes and 5000tons for cast iron fittings each year.
As the professional supplier, we have a high-qualified team focused on products design, quality control and customer service.
we strictly follow the quality management system ISO9001. Cast Iron Pipes and fittings are CSA and UPC certified.
we also supply stainless steel couplings for pipes and fittings.
For CSA B70 cast iron pipes and fittings, our main customers are in Canada.
3. Package:
The Cast Iron Pipes are packed by wood pallets | The Cast Iron Fittings are packed in wood or metal crate |
4. Delivery Time:
The finished time of orders depends on our production schedule plan and your order qty.
normally the cast iron pipes finish time is more quickly, after order confirmed, we could finish in 2 weeks.
The cast iron fittings take a bit longer time than pipes, normally it will take about 4-6 weeks.
But mechnical mould fittings are finished more quickly, it will only take about 3-4 weeks.
5. Quality Control:
We have QC team to inspect each order.
a. we check the raw material chemical components analysis to make sure the material is qualifed of grey cast iron.
b. during production we will check the hydrostatic test, wall thickness, length etc.
d. final inspection before delivery
6. Payment Terms:
We accept TT and LC payment.
30% deposit, balance paid before sending out from factory.
7: Other products related to cast Iron fittings:
8. Contact Information:
DINGGIN HARDWARE (DALIAN) CO., LTD | |
Name: | Kelly Sun |