Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing

Customization: Available
Type: Stainless Steel Pipes
Standard: ASTM, AISI, DIN

Products Details

Basic Info.

Certification
ISO
Shape
Round
Technique
Cold-Drawing
Surface Treatment
Polished
Od
1/4" - 1 1/2"
Wall Thickness
0.02" - 0.065"
Length
8000FT
Transport Package
Wooden Cases
Specification
as per customers′ request
Trademark
GUO TAI
Origin
China
HS Code
7304419000
Production Capacity
20000 Meters/Month

Product Description

Bright annealed 304 304L 316 316L stainless steel welded coiled tube 

Product Introduction

Standard ASTM  A269, A213, A312, A511, A789, A790, A376, EN 10216-5, EN 10297,DIN 17456, DIN 17458,JISG3459, JIS GS3463, GS3467, JIS G3448, GOST 9940, GOST 9941
Material TP304/304L/304H, 316/316L, 321/321H, 317/317L, 347/347H, 309S, 310S, 2205, 2507, 904L (1.4301, 1.4306, 1.4948, 1.4401, 1.4404, 1.4571, 1.4541, 1.4833, 1.4878, 1.4550, 1.4462, 1.4438, 1.4845)
Size range OD:1/4" (6.25mm) to 1 1/2" (38.1mm), WT 0.02" (0.5mm) to 0.065" (1.65mm)
Length 50 m ~ 2000 m, as per your request
Processing Cold drawn, Cold rolled, Precision Rolled for Seamless Pipe or Tube
Finish Annealed & pickled, bright annealing, polished
Ends Beveled or plain end, square cut, burr free ,Plastic Cap at Both end
 
OEM Service Accept customized base on the drawing.
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing
Oilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing


Oilfield Durable New Stainless Steel Seamless Seamless Coiled TubingOilfield Durable New Stainless Steel Seamless Seamless Coiled TubingOilfield Durable New Stainless Steel Seamless Seamless Coiled TubingOilfield Durable New Stainless Steel Seamless Seamless Coiled TubingOilfield Durable New Stainless Steel Seamless Seamless Coiled Tubing

1.Q: Are you a trading company or a factory?
   A: We are the integration of industry and trade.

2. Q: Can you accept customization?
    A: Accept any customization of materials and processing technology.

3.Q: What is the production time for new molds and mass production?
   A: 7-15 days (according to different sizes) to build a new mold. Mass production takes about 20 days, and orders range from 0.5 tons to 300 tons. Normally, we can deal with it quickly.

4.Q: Do you provide free samples?
   A: Yes, we can provide free samples for testing. If you need mold making, you need to pay separately, and the buyer should bear all costs.

5. Q: How do you guarantee your products?
   A: Every product is manufactured in a certified workshop. We provide customers with certificates to ensure quality, and we can also provide samples for your testing before mass production.

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours